Home ProductsSlab Formwork System

Nonstandard High efficient Floor Slab Formwork System for concrete pouring of slabs

Send Me The Latest Product Alerts
(No SPAM - We would not sell or share your e-mail address.)

Nonstandard High efficient Floor Slab Formwork System for concrete pouring of slabs

Good Quality Nonstandard High efficient Floor Slab Formwork System for concrete pouring of slabs Sales

Large Image :  Nonstandard High efficient Floor Slab Formwork System for concrete pouring of slabs

Beijing Zulin Formwork & Scaffolding Co., Ltd.

Verified Supplier

Beijing, China (Mainland)

Business type: Manufacturer, Distributor/Wholesaler, Exporter, Trading Company, Seller

Telephone : 86-010-69407048

Juyuan Industry Field No.20, Mapo Town, Shunyi District, Beijing, P.R. of China, 101300

Product Details:

Place of Origin: Beijing, China (Mainland)
Brand Name: ZULIN
Certification: ISO9001-2008
Model Number: Floor formwork

Payment & Shipping Terms:

Minimum Order Quantity: One 20ft container
Price: Negotiation
Packaging Details: In bulk,pallet,bundle or according the customer demand
Delivery Time: After deposit 15-20 days
Payment Terms: T/T L/C (bank transfer)
Supply Ability: 100sets/day
Detailed Product Description

Nonstandard High efficient Floor Slab Formwork System for concrete pouring of slabs

Descrition:

Nonstandard High efficient Floor Slab Formwork System for concrete pouring of slabs

Product Name:Nonstandard Slab Formwork

 

Nonstandard slab formwork is widely used in concrete pouring of slabs. Floor props or scaffoldings with 

supporting heads are the supporting system. The main beam and secondary beam are timber beams with 

plywood on the topside. The system has many advantages, such as simple structure, easy assembly and 

dismantling, flexible location and being able to reuse.



The supporting head series

In concrete pouring of the slabs, supporting head series support the slab formwork. Some of them can

 move early or quickly. Subject to the demand, various kinds of supporting heads are able to work together, 

thus making construction work much more efficient.





The Sketches  

               Cross head

            U-head 

                                Nonstandard High efficient Floor Slab Formwork System for concrete pouring of slabs

Nonstandard High efficient Floor Slab Formwork System for concrete pouring of slabs

 

Early striking ring head assembly

Early striking head

Lowering head

Nonstandard High efficient Floor Slab Formwork System for concrete pouring of slabs

Nonstandard High efficient Floor Slab Formwork System for concrete pouring of slabs

Nonstandard High efficient Floor Slab Formwork System for concrete pouring of slabs

   


 

Early Striking Head Disassembly Progress  

 

 

 

Nonstandard High efficient Floor Slab Formwork System for concrete pouring of slabs


Nonstandard High efficient Floor Slab Formwork System for concrete pouring of slabs
 

Nonstandard High efficient Floor Slab Formwork System for concrete pouring of slabs



    After concreting, 

hit the pin plate to let it move.
 


  
   When the pin plate 

move to the right position,

 the movable part of the 

head and main beam will come down.

    Remove the main 

beam for reuse.

 


 Lowering head Disassembly Progress

 

Nonstandard High efficient Floor Slab Formwork System for concrete pouring of slabs

Nonstandard High efficient Floor Slab Formwork System for concrete pouring of slabs

Nonstandard High efficient Floor Slab Formwork System for concrete pouring of slabs

     After the concrete pouring, 

hit the pin plate to let it move.


   
    
    When the pin plate 

move to the right position, 

the main beam, secondary

 beam and plywood 

will come down in order.
 


    
     Remove the timber beams, 

plywood, lowering heads 

and floor props.
 

 

Contact Details
China Construction Material Online Market

Send your inquiry directly to us (0 / 3000)